We change the simple 2U survival model a bit to add in extra storage space by making the bathroom and shower Us deeper. Adam put all our changes as well as the location of kitchen, sinks, and rocket mass heater into a solid works drawing.
Next we started building the conduit pipes. These had to be burried in place according to where we expect each of the utility lines to go.
We needed to bend some of the pipes so we used what we got. Fire works surprisingly well.
We laid down the conduit and then proceeded to mark where we need to dig and bury.
Once we finished burying the conduits we tamped it all down with the tamper.
That's it the site is ready for building on!