For the entrance floor we decided to install a custom fabricated floor grate to catch the dirt tracked in from the outdoors.
The grate was made in two parts for ease of install. The grey portion was installed first and has accumulated concrete dust. The original finish is black spray paint, which you can see in the freshly installed section.
All flooring is now complete!
Thank you Hastings Highlands Worker Co-operative (HHWC) for design, fabrication and install.
No comments:
Post a Comment